| Copyright (c) Queen's Printer, Victoria, British Columbia, Canada |
IMPORTANT INFORMATION |
| B.C. Reg. 104/2004 M62/2004 |
Deposited March 23, 2004 effective April 1, 2004 |
[includes amendments up to B.C. Reg. 38/2008, February 27, 2008]
1 For the purposes of the Act:
"boiler" means a vessel, in which by the application of heat,
(a) gas, steam or vapour is capable of being generated and pressurized, or
(b) a liquid is capable of being pressurized
and includes fittings and boiler external piping associated with the vessel;
"boiler system" means a power plant, low pressure steam plant, low temperature low pressure fluid plant, low pressure fluid plant, low pressure thermal fluid plant, high pressure thermal fluid plant, oil well plant, greenhouse plant or pressure plant;
"pressure piping" means a system of pipes, tubes, conduits, gaskets, bolts and other components, the sole purpose of which is the conveyance of an expansible fluid under pressure and the control of the flow of an expansible fluid under pressure between 2 or more points;
"pressure vessel" means a vessel and its fittings, other than a boiler, that is capable of being used to contain, store, distribute, transfer, distil, process or otherwise handle gas, vapour or liquids under pressure;
"refrigeration equipment" means machinery in which refrigerants are capable of being vaporized, compressed and liquefied;
"refrigeration system" means a refrigeration plant.
2 (1) In this regulation:
"Act" means the Safety Standards Act;
"antique show boiler" means a boiler forming part of a traction engine, threshing machine, donkey boiler plant, or other plant which is operated for historical interest or demonstration purposes and is not used for commercial purposes;
"assistant chief engineer" means a power engineer who
(a) is employed in a plant to assist the chief engineer,
(b) holds a certificate of qualification not less than one class lower than that required to operate the plant as the chief engineer, and
(c) is placed in charge of the plant when the chief engineer is absent from the plant;
"assistant engineer" means the power engineer who is a person in charge of a part of a plant under the supervision of the shift engineer;
"assistant shift engineer" means the power engineer who is under the immediate supervision of the shift engineer and assists the shift engineer with the supervision or operation of the plant;
"boiler capacity" means the heat receiving surface of a boiler as specified in section 46;
"brazer" means a pressure brazer;
"brazing" means pressure brazing;
"chemical recovery boiler" means a boiler that is capable of being fuelled by the black liquor that results from the Kraft pulp manufacturing process;
"chief engineer" means a power engineer who is designated by the owner to be responsible for the operation and maintenance of a plant and who is responsible for ensuring that all regulated work in the plant is performed by appropriately qualified persons;
"code" means the current edition of a code or standard referred to in the Schedule and adopted under this regulation;
"compressed gas" means a gas or combination of gases that is contained under pressure whether or not the gases are liquefied, vaporized, dissolved or in any combination of these states;
"control system" means an electronic, digital, pneumatic or other system that compares the process variable to a set point and automatically adjusts the input signal to the final control device;
"CSA B51" means the CSA Standard B51, the Boiler, Pressure Vessel and Pressure Piping Code;
"CSA B52" means the CSA Standard B52, the Mechanical Refrigeration Code;
"cushion tank" means a pressure vessel designed for installation in a fluid plant or cooling system to provide a pneumatic cushion for the expansion or contraction of the fluid;
"electric boiler" means a boiler heated by electricity;
"engineering degree" means a degree in mechanical engineering from an institute of learning that has been registered by the council of The Association of Professional Engineers and Geoscientists of the Province of British Columbia under the Engineers and Geoscientists Act;
"expansible fluid" means any
(a) vapour,
(b) gaseous substance, or
(c) liquid under such pressure and temperature that changes to a vapour when the pressure is reduced to atmospheric pressure;
"fitting" means a valve, gauge, regulating or controlling device, flange, pipe fitting, nozzle or other component that is attached to or forms part of a boiler, a pressure vessel, a pressure piping system or refrigeration equipment, but does not include pressure piping on a pressure vessel;
"fluid plant" means an assembly of one or more boilers that has a working pressure not more than 1 100 kPa and an operating temperature of 121°C or less, containing liquid but not thermal fluids;
"fuel cut-off device" means any device that has a manual reset and which will cut off fuel to the boiler burner when activated by a safety device;
"fuel firing system" means an assembly of equipment used to condition, convey, regulate, burn and exhaust combustible gaseous, liquid and solid fuels in a plant;
"general supervision status plant" means a plant for which the supervision of boilers, pressure vessels or refrigeration equipment is carried out in accordance with the requirements set out in section 55 and the technical and administrative specifications required by a provincial safety manager;
"greenhouse plant" means a low temperature low pressure fluid plant used in a greenhouse, hot house, horticultural facility or other vegetable, flower or tree growing operation;
"heat exchanger" means a vessel other than a boiler where heat is transferred, either directly or indirectly, from one medium to another;
"heating surface" means the surface area of a boiler or pressure vessel that transfers heat, as determined under section 46;
"high pressure steam plant" means an assembly of one or more boilers and includes ancillary equipment, the pressure piping system and a pressure plant, in which steam or vapour is generated at a pressure greater than 103 kPa;
"high pressure thermal fluid plant" means an assembly of one or more thermal fluid boilers, but does not include a low pressure thermal fluid plant, and includes ancillary equipment, a pressure piping system and a pressure plant connected to an assembly of thermal fluid boilers;
"high temperature, high pressure fluid plant" means an assembly of one or more boilers and includes ancillary equipment, a pressure piping system and a pressure plant, in which liquid is heated to a temperature greater than 121°C or liquid is contained at a pressure greater than 1 100 kPa;
"hydraulic or hydraulic purposes" means a system of machinery and auxiliary components that utilize only an incompressible fluid under pressure to generate, transmit and control mechanical energy;
"ice facility plant" means a refrigeration plant used to make and maintain an artificial ice surface that is used for recreational purposes;
"institution" means premises in which persons are confined to receive medical, charitable, educational or other care or treatment, or in which persons are held or detained;
"interim power engineer's certificate of qualification" means a certificate issued under section 27 for a specific plant operation;
"low pressure fluid plant" means an assembly of one or more fluid boilers that operate at a temperature of 121°C or less, but greater than 100°C, and a pressure of 1 100 kPa or less, but greater than 206 kPa, and includes ancillary equipment, a pressure piping system and a pressure plant;
"low pressure thermal fluid plant" means an assembly of one or more thermal fluid boilers that have no valves or other obstruction to prevent circulation between the boiler and an expansion tank that is fully vented to the atmosphere, and includes ancillary equipment, a pressure piping system and a pressure plant;
"low temperature low pressure fluid plant" means an assembly of one or more boilers, including ancillary equipment, that contain liquid and operate at a working pressure of 206 kPa or less and a temperature of 100°C or less;
"low pressure steam plant" means an assembly of one or more boilers that operate at a steam or vapour pressure of 103 kPa or less and includes a pressure plant that is connected to the assembly of boilers;
"maintenance engineer" means a power engineer employed in the maintenance of a plant or associated auxiliary equipment;
"oil well plant" means a high pressure steam plant that is used in the operation of a drilling rig or drilling operation;
"person in charge" means the power engineer, operator or other individual present on the premises during a period of time, and designated by the owner or chief engineer to be responsible for and in control of the plant while it is in operation;
"plant" means a power plant, low pressure steam plant, low temperature low pressure fluid plant, low pressure fluid plant, low pressure thermal fluid plant, high pressure thermal fluid plant, refrigeration plant, oil well plant, unfired plant, greenhouse plant or pressure plant;
"power engineer" means an individual who holds a final or interim certificate of qualification issued under section 13, 15, 17, 19, 23, 28 or 29;
"power engineer trainee" means an individual who has received training and who assists in the operation of a plant but does not hold a certificate of qualification;
"power plant" means a high pressure steam plant or a high pressure thermal fluid plant or a high temperature high pressure fluid plant;
"pressure" means gauge pressure; for the purposes of this regulation, 103 kPa is equivalent to 15 psi;
"pressure plant" means an assembly of one or more pressure vessels and includes the engines, turbines, pressure piping systems, fittings, machinery and ancillary equipment of any kind used in connection with it or them;
"pressure vessel plant" means a pressure plant that is not connected to a boiler plant or refrigeration plant;
"pressure brazer" means a brazer conforming to the Welder or Brazer Performance Qualifications of CSA B51;
"pressure brazing" means brazing conforming to the brazing qualifications of CSA B51;
"pressure welder" means a welder conforming to the Welder or Brazer Performance Qualifications of CSA B51;
"pressure welding" means welding conforming to the welding or brazing qualifications of CSA B51;
"public assembly occupancy premises" means premises in which persons congregate for civic, political, educational, religious, social or recreational purposes;
"refrigerant" means a fluid that absorbs heat at a low temperature and pressure, with a change in state, and rejects it at a higher temperature and pressure;
"refrigerant group" means the classification of one or more refrigerants into risk categories based on flammability and toxicity as defined in CSA B52;
"refrigeration mechanic" means a person who holds an industry training credential issued under the Industry Training Authority Act as a refrigeration mechanic;
"refrigeration plant" means an assembly of refrigeration equipment and includes a pressure plant connected to it;
"risk assessed status plant" means a plant for which the supervision of boilers, pressure vessels or refrigeration equipment is done in accordance with the requirements set out in section 56 and the technical and administrative specifications required by a provincial safety manager;
"shift engineer" means a power engineer who is a person in charge of a plant under the supervision of a chief engineer or one who is in charge of a plant when the chief engineer is absent;
"thermal fluid" means fluids other than water or aqueous solutions that transfer heat with or without vaporization;
"thermal fluid boiler" means boiler, including fittings and appurtenances, in which a liquid hydrocarbon, hot oil or other thermal fluid other than water is heated with or without the occurrence of vaporization;
"thermal fluid plant" means an assembly of one or more thermal fluid boilers and includes a pressure plant that is connected to the assembly of boilers;
"unfired boiler" means a pressure vessel in which gas, steam or vapour may be generated for use external to the boiler by the application of heat resulting from something other than the combustion of fuel;
"unfired plant" means a plant where heat from gas, steam or vapour or other heating medium is supplied to heat exchangers or used directly for the purpose of heating a facility or a process without combustion of a solid, liquid or gaseous fuel taking place on the premises;
"water heater" means a vessel heated by the combustion of fuel, electricity or any other source for supplying potable hot water at pressures not exceeding 1 103 kPa and temperatures not exceeding 98.9°C;
"welder" or "welding" means pressure welder or pressure welding.
(2) For the purposes of this regulation 1 square metre (m2) is equivalent to 10.76 square feet (ft2).
[am. B.C. Reg. 475/2004, Sch. 4, s. 1.]
3 (1) This regulation applies in respect of every boiler and boiler plant, every pressure plant, every pressure vessel, every pressure piping system, every fitting, every plant and all refrigeration equipment and refrigeration plants.
(2) Despite subsection (1), this regulation does not apply to any of the following:
(a) a power plant with a heating surface of 2 m2 or less;
(b) a low pressure steam plant with a heating surface of 3 m2 or less;
(c) a fluid plant with a heating surface of 3 m2 or less;
(d) a low pressure thermal fluid plant with a heating surface of 3 m2 or less;
(e) a fluid plant that has no valves or other obstruction to prevent circulation of fluid between the boiler and an expansion tank that is fully vented to the atmosphere;
(f) a fluid plant used to heat a building that contains only 4 or fewer self contained residential units;
(g) a pressure vessel operating at and with relief valves set at a pressure of 103 kPa or less;
(h) a pressure vessel not equipped with heating element that is constructed for the storage of water at a temperature of 65°C or less and a pressure of 1 720 kPa or less or has a diameter of 610 mm or less;
(i) a pressure vessel used for hydraulic purposes having an operating temperature of less than 82°C, if the primary design considerations are mechanical in nature and stresses are derived from the functional requirements of the device rather than fluid pressure;
(j) a refrigeration plant with a capacity of less than 5 kW prime mover nameplate rating;
(k) a cushion tank with a diameter of 610 mm or less that is constructed to operate at a working pressure of 207 kPa or less;
(l) a distribution main or service pipe as defined in the Gas Safety Regulation;
(m) pressure piping and fittings external to the boiler proper in a low temperature low pressure fluid plant;
(n) a pressure piping system operating at and with a relief valve or valves set at 103 kPa or less;
(o) a water heater with a heat input of 120 kW or less;
(p) a boiler or pressure vessel subject to the jurisdiction of Transport Canada under the Transportation of Dangerous Goods Act (Canada) or a boiler or pressure vessel subject to the Canadian Shipping Act;
(q) gas-insulated switchgear and control gear used for control of high voltage electricity;
(r) refrigeration equipment used for air conditioning or refrigerated compartments on railway cars, motor vehicles, motor-drawn vehicles, aircraft or ships.
4 Each code or standard and portion of a code or standard as listed in the Schedule is adopted.
[en. B.C. Reg. 50/2007, Sch. 2, s. 1.]
Part 1 — General Qualification and Licensing Provisions
Division 1 — Individuals Who May Perform Regulated Work under This Regulation
5 (1) An individual must not perform regulated work unless the individual
(a) holds a valid certificate of qualification issued under this regulation,
(b) performs regulated work in accordance with section 5 of the Safety Standards General Regulation,
(c) is specifically authorized in this regulation, or
(d) has been exempted from any specified authorization requirement under this regulation.
(2) An individual must not perform maintenance and repairs on a refrigeration plant unless the individual
(a) holds a fourth class power engineer's certificate of qualification or higher, or
(b) is a refrigeration mechanic.
(3) An individual must not do pressure welding relating to regulated work under this regulation unless the individual holds a pressure welder's certificate of qualification.
6 An individual is not required to hold a certificate of qualification to operate any of the following:
(a) a power plant not exceeding 10 m2 of boiler capacity;
(b) a low pressure steam plant not exceeding 30 m2 of boiler capacity;
(c) a low pressure fluid plant not exceeding 150 m2 of boiler capacity;
(d) a low pressure thermal fluid plant not exceeding 150 m2 of boiler capacity;
(e) a low temperature low pressure fluid plant not exceeding 300 m2 of boiler capacity;
(f) an unfired plant not exceeding 150 m2 of boiler capacity;
(g) a refrigeration plant with refrigerant groups Al, A2 or B1, as defined in CSA B52, not exceeding a total plant capacity of 200 kW prime mover nameplate rating;
(h) a refrigeration plant with refrigerant groups A3, B2 or B3, as defined in CSA B52, not exceeding a total plant capacity of 50 kW prime mover nameplate rating;
(i) an electric boiler that consumes 100 kW or less in a power plant;
(j) a process
(i) in a petroleum refinery other than in a power plant that is part of the petroleum refinery, and
(ii) if the heat for the process is generated as a result of a reaction that is part of the process or burning;
(k) a pressure vessel plant.
Division 2 — Certificates of Qualification
7 (1) The following classes of certificates of qualification are established:
(a) first class power engineer;
(b) second class power engineer;
(c) third class power engineer;
(d) fourth class power engineer;
(e) fifth class power engineer (boiler endorsement);
(f) fifth class power engineer (refrigeration endorsement);
(g) category "A" interim power engineer;
(h) category "B" interim power engineer;
(i) greenhouse boiler operator;
(j) oil well boiler operator;
(k) antique show boiler operator;
(l) ice facility operator;
(m) boiler safety awareness;
(n) refrigeration safety awareness;
(o) pressure welder.
(2) An applicant for a certificate of qualification must provide a signed, written statement from the chief engineer of the plant in which the applicant is employed, that
(a) sets out in detail the qualifying time, experience, knowledge and qualifications of the applicant, and
(b) describes the plant in which the applicant is employed, including the boiler capacity and types of equipment in the plant.
(3) For the purposes of subsection (2), if there is no chief engineer, the statement may be provided by the owner of the plant.
(4) For the purposes of this section, a provincial safety manager may recognize equivalent training and experience that an applicant has gained from a jurisdiction other than British Columbia, subject to an examination of the applicant, as counting toward the requirements to obtain a corresponding class of power engineer's certificate of qualification issued under this regulation.
8 (1) For this section and section 9, "standardized certificate of competency" means a certificate by that name issued by another jurisdiction in Canada that provides evidence of an individual's level of competence as a power engineer.
(2) An individual who holds a standardized certificate of competency may be issued a power engineer's certificate of qualification of the same class for the purposes of the Act if
(a) the individual presents the standardized certificate to a provincial safety manager, and
(b) the individual provides evidence, acceptable to a provincial safety manager, of having the work experience required to obtain a certificate of qualification of that class.
9 (1) For this section, "certificate of competency" means a document issued in Canada, other than a certificate of qualification under the Act or a standardized certificate of competency, that provides evidence of an individual's level of competence as a power engineer.
(2) An individual who holds a certificate of competency issued in another province or a marine (steam) certificate of competency may be issued a power engineer's certificate of qualification for the purposes of the Act of one class lower than the class for which the person holds the certificate of competency if
(a) the individual presents the certificate of competency to a provincial safety manager, and
(b) the individual provides evidence, acceptable to a provincial safety manager, of the work experience and other qualifications that are required to obtain a power engineer's certificate of qualification of that lower class.
10 The holder of any class of power engineer's certificate of qualification may perform the duties authorized for the holder of a power engineer's certificate of qualification of a lower classification.
11 (1) A power engineer must thoroughly inspect every boiler, pressure vessel, pressure piping system, fuel system, fitting and ancillary equipment as soon as practical after the start of the shift.
(2) While a plant is in operation, a power engineer, a boiler operator or a refrigeration operator who is authorized to be in charge of a shift for the type and size of plant as specified in the scope of each certificate of qualification, must be present
(a) in the plant boiler room, refrigeration machinery room or engine or turbine room, or
(b) in the immediate vicinity within the plant premises.
12 A greenhouse boiler operator certificate of qualification is valid only for the time that the individual named on the certificate of qualification is employed at the plant named on the certificate of qualification and for the plant capacity stated on the certificate of qualification.
13 (1) An applicant for a first class power engineer's certificate of qualification must hold a second class power engineer's certificate of qualification or a second class power engineer's standardized certificate of competency, and have been employed, while in possession of that certificate, for a period of not less than
(a) 36 months as chief engineer of a power plant that has a boiler capacity that exceeds 500 m2,
(b) 36 months as an assistant chief engineer of a power plant that has a boiler capacity that exceeds 1 000 m2,
(c) 36 months as a safety officer for the purposes of this regulation,
(d) 48 months as a shift engineer of a power plant that has a boiler capacity that exceeds 500 m2, or
(e) 48 months as an assistant shift engineer of a power plant that has a boiler capacity that exceeds 1 000 m2.
(2) If an applicant has successfully completed a first class power engineering course that has been approved by a provincial safety manager, the required periods of employment referred to in subsection (1) are reduced by 12 months.
(3) If an applicant holds an engineering degree acceptable to a provincial safety manager the required period of employment for the positions and types of plants set out in subsection (1) is 24 months.
14 A first class power engineer's certificate of qualification entitles the holder to be chief engineer of any plant.
15 (1) An applicant for a second class power engineer's certificate of qualification must
(a) hold a first class marine engineer (motor) certificate of competency, or
(b) hold a third class power engineer's certificate of qualification or a third class power engineer's standardized certificate of competency and have been employed, while in possession of a third class power engineer’s certificate of qualification, for a period of not less than
(i) 30 months as a chief engineer of a power plant that has a boiler capacity that exceeds 150 m2,
(ii) 30 months as a chief engineer of a low pressure steam plant that has a boiler capacity that exceeds 500 m2,
(iii) 36 months as a shift engineer or as an assistant chief engineer of a power plant that has a boiler capacity that exceeds 250 m2,
(iv) 48 months as an assistant shift engineer or maintenance engineer of a power plant that has a boiler capacity that exceeds 1 000 m2,
(v) 60 months as an assistant engineer of a power plant that has a boiler capacity that exceeds 1 000 m2 performing duties approved by a provincial safety manager as providing suitable experience, or
(vi) one half of the period set out in subparagraph (i) or (ii) in the position and in the size and type of plant set out in that subparagraph, and have been employed for a period of not less than 48 months as a maintenance engineer.
(2) If an applicant has successfully completed a second class power engineering course that has been approved by a provincial safety manager, the required periods of employment referred to in subsection (1) (b) (i) to (v) are reduced by 9 months.
(3) If an applicant holds an engineering degree acceptable to a provincial safety manager, the required periods of employment for the positions and types of plants set out in subsection (1) (b) (i) to (v) are reduced by one half.
[am. B.C. Reg. 475/2004, Sch. 4, s. 2.]
16 A second class power engineer's certificate of qualification entitles the holder to be
(a) chief engineer of a power plant that has a boiler capacity of 1 000 m2 or less,
(b) chief engineer of any low pressure steam plant, fluid plant, low pressure thermal fluid plant or low temperature low pressure fluid plant, or
(c) shift engineer of any plant.
17 (1) An applicant for a third class power engineer’s certificate of qualification must
(a) hold a second class marine engineer (motor) certificate of competency, or
(b) hold a fourth class power engineer’s certificate of qualification or a standardized fourth class power engineer’s certificate of qualification and have been employed, while in possession of a fourth class power engineer’s certificate of qualification, for a period of not less than
(i) 24 months as a power engineer in a position requiring a fourth class power engineer’s certificate of qualification in a power plant that has a boiler capacity that exceeds 50 m2,
(ii) 36 months as a shift engineer of a low pressure steam plant that has a boiler capacity that exceeds 300 m2,
(iii) 36 months as a chief engineer of a fluid plant or low pressure thermal fluid plant that exceeds 500 m2 boiler capacity,
(iv) 36 months as a maintenance engineer of a power plant that has a boiler capacity that exceeds 50 m2,
(v) 36 months of relevant experience as an assistant engineer of a power plant that has a boiler capacity that exceeds 500 m2, or
(vi) 48 months as a power engineer in a fluid plant, or a thermal fluid plant that has a boiler capacity that exceeds 500 m2 of boiler capacity.
(2) If an applicant has successfully completed a third class power engineering course that has been approved by a provincial safety manager, the required periods of employment referred to in subsection (1) (b) (i) to (v) are reduced by 6 months.
(3) If an applicant holds an engineering degree acceptable to a provincial safety manager, the required periods of employment for the positions and types of plants set out in subsection (1) (b) (i) to (v) are reduced by one half.
(4) Despite subsection (1) (b), an individual may apply for a third class power engineer’s certificate of qualification if the individual
(a) holds a diploma issued after completing a 2 year full time day program in third class power engineering that has been approved by a provincial safety manager, and
(b) has been employed for at least 6 months in a power plant that has a boiler capacity of not less than 100 m2.
(5) A one time 3 month credit towards the qualifying time requirement specified in subsection (4) (b) will be granted to candidates who have received boiler plant computer simulation training at an educational or vocational facility approved by a provincial safety manager.
[am. B.C. Reg. 475/2004, Sch. 4, s. 3.]
18 A third class power engineer's certificate of qualification entitles the holder to be
(a) chief engineer of a power plant that has a boiler capacity of 500 m2 or less,
(b) chief engineer of any low pressure steam plant, fluid plant, low pressure thermal fluid plant or low temperature low pressure fluid plant,
(c) chief engineer of any unfired plant, or
(d) shift engineer of a power plant or high pressure thermal fluid plant that has a boiler capacity of 1 000 m2 or less.
19 An applicant for a fourth class power engineer’s certificate of qualification must
(a) be the holder of a third class marine engineer (motor) certificate of competency, or
(b) have been employed
(i) for a period of not less than 12 months as a power engineer in a fifth class plant in a position requiring a fifth class power engineer’s certificate of qualification,
(ii) for a period of not less than 12 months as a power engineer trainee in
(A) a power plant that exceeds 10 m2 of boiler capacity,
(B) a low pressure steam plant that exceeds 30 m2 of boiler capacity,
(C) a low pressure fluid plant or low pressure thermal fluid plant that exceeds 150 m2 of boiler capacity, or
(D) a low temperature low pressure fluid plant that exceeds 300 m2 of boiler capacity, or
(iii) for a period of at least 18 months in the operation, design, construction, repair or maintenance of equipment to which the this regulation applies, and have successfully completed a fourth class power engineering course that has been approved by a provincial safety manager or provide proof of having an equivalent technical educational background that is approved by a provincial safety manager.
(2) If an applicant has successfully completed a fourth class power engineering course that has been approved by a provincial safety manager, the required periods of employment referred to in subsection (1) (a) or (b) are reduced by 6 months.
(3) If an applicant holds an engineering degree acceptable to a provincial safety manager, the required periods of employment for the positions and types of plants set out in subsection (1) (a) or (b) are reduced by one half.
(4) Despite subsection (1) but subject to section 7 (2) and (3), a fourth class power engineer’s certificate of qualification may be issued to a person who holds a diploma issued after completing a one year full time day program in fourth class power engineering that has been approved by a provincial safety manager.
[am. B.C. Reg. 475/2004, Sch. 4, s. 4.]
20 A fourth class power engineer’s certificate of qualification entitles the holder to be
(a) chief engineer of a power plant that has a boiler capacity of 150 m2 or less,
(b) chief engineer of a low pressure steam plant that has a boiler capacity of 500 m2 or less,
(c) chief engineer of a fluid plant that has a boiler capacity of 1 000 m2 or less,
(c.1) chief engineer of a low pressure thermal fluid plant that has a boiler capacity of 1 500 m2 or less,
(d) chief engineer of a low temperature low pressure fluid plant,
(e) chief engineer of an unfired plant that has a boiler capacity of 1 000 m2 or less,
(f) chief engineer of any refrigeration plant,
(g) shift engineer of a power plant that has a boiler capacity of 500 m2 or less,
(h) shift engineer of any low pressure steam plant, or
(i) shift engineer of a low pressure fluid plant or a low pressure thermal fluid plant or low temperature low pressure fluid plant.
[am. B.C. 218/2006, s. 1.]
21 The holder of a valid power engineer’s certificate of qualification of 4th class or higher issued under the Act may, while employed by a licensed boiler or refrigeration contractor or working under an operating permit and without requiring any additional authorization, do any of the following with respect to electrical equipment that is part of a plant:
(a) connect branch circuit wiring to the boiler equipment integral connection box from a junction box or disconnect mounted in close proximity to the boiler equipment;
(b) perform work on class 2 circuit wiring up to a rated output of 100 Volt amps;
(c) perform work on low voltage controls or 24 volt thermostats;
(d) perform work on three phase motors or controllers integral to the boiler equipment.
[am. B.C. Reg. 475/2004, Sch. 4, s. 5.]
22 (1) The chief power engineer of a first or second class plant may, for the purposes of carrying out maintenance and repairs on a boiler, shut off and place back into service the gas system of the plant including, but not limited to, downstream of the service meter up to and including the burners.
(2) The chief power engineer of a third or fourth class plant may, for the purpose of carrying out maintenance on a boiler, disconnect the gas line to a boiler, up to and including the burners, and reconnect the line once the maintenance is complete.
[am. B.C. Reg. 475/2004, Sch. 4, s. 6.]
23 (1) An applicant for a fifth class power engineer’s certificate of qualification (boiler endorsement) must
(a) Repealed. [B.C. Reg. 475/2004, Sch. 4, s. 7 (a).]
(b) have experience for a period of not less than 8 months as a power engineer trainee in a power plant that has a boiler capacity that exceeds 10 m2, a low pressure steam plant that has a boiler capacity that exceeds 30 m2, a low pressure thermal fluid plant that has a boiler capacity that exceeds 150 m2 of boiler capacity or a fluid plant that has a boiler capacity that exceeds 150 m2 of boiler capacity,
(c) have experience for a period of not less than 8 months in the design, construction, repair, operation or maintenance of equipment to which this regulation applies, and have successfully completed a fifth class power engineering course (with a boiler endorsement) that has been approved by a provincial safety manager or provide proof of having an equivalent technical educational background that has been approved by a provincial safety manager, or
(d) be the holder of a marine engineer (motor) certificate of competency.
(2) If an applicant holds an engineering degree acceptable to a provincial safety manager or has successfully completed a fifth class power engineering course that has been approved by a provincial safety manager, the required periods of employment referred to in subsection (1) (a) or (b) are reduced by 4 months.
[am. B.C. Reg. 475/2004, Sch. 4, s. 7.]
24 A fifth class power engineer’s certificate of qualification (boiler endorsement) entitles the holder to be
(a) chief engineer of a
(i) power plant that has a boiler capacity that does not exceed 75 m2, or
(ii) low pressure steam plant that has a boiler capacity that does not exceed 300 m2,
(b) chief engineer of a low pressure fluid plant or a low pressure thermal fluid plant that has a boiler capacity of 500 m2 or less,
(c) chief engineer of a low temperature low pressure fluid plant that does not exceed 1 000 m2 of boiler capacity,
(d) chief engineer of an unfired plant that does not exceed 500 m2 of boiler capacity, or
(e) shift engineer of
(i) a power plant that has a boiler capacity of 150 m2 or less,
(ii) a low pressure steam plant that has a boiler capacity of 500 m2 or less,
(iii) a low pressure fluid plant that has a boiler capacity of 1 000 m2 or less,
(iii.1) a low pressure thermal fluid plant that has a capacity of 1 500 m2 or less,
(iv) any low temperature low pressure fluid plant, or
(v) any unfired plant.
[am. B.C. Reg. 218/2006, s. 2.]
25 (1) An applicant for a fifth class power engineer's certificate of qualification (refrigeration endorsement) must
(a) have been employed for a period of not less than one year assisting in the operation of a refrigeration plant that uses
(i) group A3, B2 or B3 refrigerants and has a capacity of more than 25 kW of prime mover name plate rating, or
(ii) group A1, A2 or B1 refrigerants and has a capacity of more than 125 kW of prime mover name plate rating, or
(b) be a refrigeration mechanic.
(2) If an applicant has successfully completed a fifth class power engineering (refrigeration endorsement) course that has been approved by a provincial safety manager, the required periods of employment referred to in subsection (1) (a) are reduced by 4 months.
26 A fifth class power engineer's certificate of qualification (refrigeration endorsement) or any other power engineer's certificate of qualification higher than fifth class entitles the holder to be a person in charge of any type and size of refrigeration plant.
27 (1) A provincial safety manager may, subject to sections 28 and 29, issue an interim power engineer's certificate of qualification to a power engineer of any class.
(2) A provincial safety manager, may, subject to sections 28 and 29, issue a fifth or fourth class interim power engineer's certificate of qualification to an individual with qualifications that are acceptable to a provincial safety manager.
(3) An interim certificate of qualification issued under subsection (1) or (2) entitles the holder to perform duties for the limited period of time set out on the certificate.
28 (1) Subject to section 7 (2) and (3) of this regulation, the chief engineer of a plant, or, if there is no chief engineer, the owner of a plant, may apply for a category "A" interim power engineer certificate of qualification on behalf of a power engineer who holds a power engineer's certificate of qualification that is one class lower than that required for the relevant position and who has been employed in the plant or an equivalent plant for a period of at least 12 months if
(a) the boiler capacity of the plant is increased, or
(b) the power engineer employed in the plant needs more time, because of a reason acceptable to a provincial safety manager, to prepare for any required examinations.
(2) A category "A" interim power engineer's certificate of qualification is in force for not more than 12 months from the date of issue.
(3) Despite subsection (2), on application by the owner or chief engineer of a plant, a category "A" interim power engineer's certificate of qualification issued to a power engineer in that plant, who has attempted to pass an examination during the time the interim certificate is in force, may be renewed by a provincial safety manager once only, for a period that does not exceed 12 months.
29 (1) The chief engineer of a plant, or, if there is no chief engineer, the owner of a plant, may apply for a category "B" interim power engineer's certificate of qualification on behalf of a power engineer who has been employed in the plant or an equivalent plant for a period of at least 12 months if there are special circumstances in the plant such as illness, extended vacations or emergencies.
(2) The power engineer referred to in subsection (1) must hold a certificate of qualification one class lower than the interim certificate applied for and the application must be approved by a provincial safety manager.
(3) A category "B" interim power engineer's certificate of qualification is in force for no more than 60 days from the date of issue.
(4) Despite subsection (3), on application by the owner or chief engineer of a plant, a category "B" interim power engineer's certificate of qualification issued to a power engineer in that plant may be renewed by a provincial safety manager once only, for a period that does not exceed 30 days.
30 An applicant for a greenhouse boiler operator certificate of qualification must
(a) be employed at, and have experience in the operation of, a greenhouse plant for a period of not less than 30 days,
(b) have successfully completed a greenhouse boiler operator's course that has been approved by a provincial safety manager,
(c) have passed the greenhouse boiler operator certificate of qualification examination, and
(d) demonstrate to a safety officer a thorough knowledge of the
(i) operation of the plant in which the applicant is employed, and
(ii) duties and responsibilities of a plant operator.
31 An applicant for an oil well boiler operator certificate must
(a) be employed at, and have experience in the operation of, an oil well plant for a period of not less than 30 days,
(b) have successfully completed an oil well boiler operator's course that has been approved by a provincial safety manager, and
(c) have passed the oil well boiler operator certificate of qualification examination.
32 The holder of an oil well boiler operator certificate of qualification may operate an oil well boiler for the holder of a boiler operating permit.
33 An applicant for an antique show boiler operator's certificate of qualification must
(a) be the owner of, or be designated in writing by the owner to be responsible for the operation and maintenance of, an antique show boiler,
(b) provide evidence, satisfactory to a provincial safety manager, that the applicant has experience with the construction, repair, operation and maintenance of antique show boilers, and
(c) satisfy a safety officer that the applicant has a thorough knowledge of the
(i) operation of the plant for which the applicant is responsible, and
(ii) duties and responsibilities of a plant operator.
34 An antique show boiler operator's certificate of qualification entitles the holder to operate the traction engine, threshing machine, donkey boiler or other demonstration or show boiler named on the certificate.
35 An applicant for an ice facility operator's certificate of qualification must
(a) be employed at, and have experience in the operation of, an ice facility plant for a period of not less than 30 days,
(b) have successfully completed an ice facility operator's course that has been approved by a provincial safety manager, and
(c) have passed the ice facility operator's certificate of qualification examination.
36 An ice facility operator's certificate of qualification entitles the holder to operate an ice facility plant that
(a) does not exceed 1 000 kW prime mover nameplate rating, and
(b) has a fifth class power engineer (refrigeration endorsement) or a fourth class power engineer as the chief engineer of the plant.
37 An applicant for a boiler safety awareness certificate of qualification must
(a) have passed the boiler safety awareness certificate examination,
(b) have completed a basic boiler plant safety program or other technical course approved by a provincial safety manager, and
(c) provide evidence, acceptable to a provincial safety manager, that the applicant has been instructed in safety procedures for the plant that the applicant wishes to work in.
38 (1) A boiler safety awareness certificate of qualification entitles the holder to monitor a boiler in any of the following kinds of plants named in the certificate:
(a) a power plant that has a boiler capacity that does not exceed 30 m2;
(b) a low pressure steam plant that does not exceed 200 m2 boiler capacity;
(c) a low pressure fluid plant or low pressure thermal fluid plant that does not exceed 500 m2 boiler capacity;
(d) a low temperature low pressure fluid plant that does not exceed 2 000 m2 of boiler capacity;
(e) an unfired plant that does not exceed 1 000 m2 boiler capacity.
(2) For the purposes of subsection (1), the holder of a boiler safety awareness certificate of qualification must be in attendance at the plant in order to monitor the boiler.
(3) The holder of a boiler safety awareness certificate of qualification is permitted to shut down the plant or initiate safety procedures only if specifically trained and assigned to perform those tasks.
39 An applicant for a refrigeration safety awareness certificate of qualification must
(a) provide proof acceptable to a provincial safety manager of instruction in safety procedures for the applicant's plant,
(b) successfully complete a basic refrigeration plant safety program or other technical course approved by a provincial safety manager, and
(c) have passed the refrigeration safety awareness certificate of qualification examination.
40 (1) A refrigeration safety awareness certificate of qualification entitles the holder to be in attendance to monitor the refrigeration plant named on the refrigeration safety awareness certificate of qualification in a general supervision or risk assessed status refrigeration plant with a total plant capacity of 1 000 kW or less prime mover nameplate rating.
(2) The holder of a refrigeration safety awareness certificate of qualification is not permitted to operate or perform any repairs to the refrigeration plant but is permitted to shut down the plant or initiate safety procedures when specifically trained and assigned to perform such tasks.
41 An applicant for a pressure welder's certificate must have successfully completed a performance qualification test that conforms to the requirements of CSA B51.
42 (1) An applicant for a pressure welder's certificate of qualification must provide to a provincial safety manager evidence that the applicant has successfully passed a performance qualification test administered by a person recognized by the provincial safety manager as competent to administer the test.
(2) An individual who holds a certificate of qualification issued under subsection (1) must renew the certificate every 6 months by providing proof to a provincial safety manager that they have worked at the appropriate skill level.
43 When the holder of a certificate of qualification issued under this regulation is employed in a plant, the original certificate must be posted in a conspicuous, clean and safe place in the plant premises.
Division 3 — Plant Classifications
44 (1) A plant classification referred to in sections 47 to 51 requires a power engineer with a corresponding class of certificate of qualification to be appointed as chief engineer of that plant.
(2) For the purposes of subsection (1), a plant is classified by the type and total capacity of the boiler or refrigeration equipment that is connected to the same header or refrigeration system, as the case may be, as detailed in sections 47 to 51.
(3) An individual who holds a power engineer's certificate of qualification that is one class lower than that required for
(a) chief engineer of a plant, may act as an assistant chief engineer of the plant, or
(b) shift engineer of a plant, may act as an assistant shift engineer of the plant.
(4) An individual who holds any class of power engineer's certificate of qualification may act as an assistant engineer.
45 Unless a plant is registered under section 54 or is exempted under section 6, the person in charge of the plant must be present at all times in the plant boiler room, refrigeration machinery room, engine turbine room or in the immediate vicinity within the plant premises while the plant is in operation.
[en. B.C. Reg. 475/2004, Sch. 4, s. 8.]
46 (1) In this section, "extended surface" does not include the area of a superheater.
(2) The heat receiving surface area of a boiler must be stated in square metres (m2), must include the extended surface and the heating surface must be computed as follows:
(a) a heating surface, as part of a circulating system in contact on one side with water or wet steam being heated and on the other side with gas or refractory being cooled, must be measured on the side receiving heat;
(b) a boiler heating surface and other equivalent surface outside the furnace must be measured circumferentially plus any extended surface;
(c) a waterwall heating surface and other equivalent surface within the furnace must be measured as the projected tube area (diameter x length) plus any extended surface on the furnace side, but in computing the heating surface for this purpose only the tubes, fireboxes, shells, tubesheets and the projected area of headers need to be considered, except that for vertical firetube steam boilers only that portion of the tube surface up to the middle of the gauge glass is to be computed.
(3) The heat receiving surface area in square metres (m2) of an electric boiler is the number obtained by dividing the maximum kilowatt input by 10.
(4) The heat receiving surface area of a coiltube or a fintube boiler includes the extended surfaces.
(5) For the purposes of sections 51 (f), 55 (1) (b) (iv), 56 (1) (d) and 88, if two or more refrigeration systems are interconnected on the refrigerant side, the refrigeration plant capacity is the sum of the prime mover name plate rating capacities of each of the systems.
48 A second class plant is a power plant that exceeds 500 m2 of boiler capacity but does not exceed 1 000 m2 of boiler capacity.
49 A third class plant is
(a) a power plant that exceeds 150 m2 of boiler capacity but does not exceed 500 m2 of boiler capacity,
(b) a low pressure steam plant that exceeds 500 m2 of boiler capacity,
(c) a low pressure fluid plant that exceeds 1 000 m2 of boiler capacity, or a low pressure thermal fluid plant that exceeds 1 500 m2 of boiler capacity, or
(d) an unfired plant that exceeds 1 000 m2 of boiler capacity.
[am. B.C. Reg. 218/2006, s. 3.]
50 A fourth class plant is
(a) a power plant that exceeds 75 m2 of boiler capacity but does not exceed 150 m2 of boiler capacity,
(b) a low pressure steam plant that exceeds 300 m2 of boiler capacity but does not exceed 500 m2 of boiler capacity,
(c) a low pressure fluid plant that exceeds 500 m2 of boiler capacity but does not exceed 1 000 m2 of boiler capacity,
(c.1) a low pressure thermal fluid plant that exceeds 500 m2 of boiler capacity but does not exceed 500 m2 of boiler capacity,
(d) a low temperature low pressure fluid plant that exceeds 1 000 m2 of boiler capacity, or
(e) an unfired plant that exceeds 500 m2 of boiler capacity but does not exceed 1 000 m2 of boiler capacity.
[am. B.C. Reg. 218/2006, s. 4.]
51 A fifth class plant is
(a) a power plant that exceeds 10 m2 of boiler capacity but does not exceed 75 m2 of boiler capacity,
(b) a low pressure steam plant that exceeds 30 m2 of boiler capacity but does not exceed 300 m2 of boiler capacity,
(c) a low pressure fluid plant, or a low pressure thermal fluid plant, that exceeds 150 m2 of boiler capacity but does not exceed 500 m2 of boiler capacity,
(d) a low temperature low pressure fluid plant that exceeds 300 m2 of boiler capacity but does not exceed 1 000 m2 of boiler capacity,
(e) an unfired plant that exceeds 150 m2 of boiler capacity but does not exceed 500 m2 of boiler capacity, or
(f) a refrigeration plant
(i) with refrigerant groups A1, A2 or B1, as defined in CSA B52, that exceeds a total plant capacity of 200 kW prime mover nameplate rating, or
(ii) with refrigerant groups A3, B2 or B3, as defined in CSA B52, that exceeds a total plant capacity of 50 kW prime mover nameplate rating.
52 A greenhouse plant is
(a) a plant named on a greenhouse boiler operator's certificate of qualification, and
(b) a low temperature low pressure fluid plant that operates at a temperature not exceeding 100°C at a maximum gauge pressure of 206 kPa and does not exceed 1 000 m2 of boiler capacity.
53 An oil well plant is
(a) a plant named on an oil well boiler operator's certificate of qualification, and
(b) a power plant operating on a portable oil rig or drilling site that does not exceed 100 m2 of boiler capacity.
54 (1) Two categories of special plant are established:
(a) a general supervision status plant;
(b) a risk assessed status plant.
(2) Every owner seeking registration of a plant under subsection (1) must
(a) apply to a provincial safety manager in the required form,
(b) submit any required fee with the application, and
(c) satisfy any of the technical requirements established by a provincial safety manager for that type of plant.
(3) Before registration of a general supervision status plant or a risk assessed status plant, a provincial safety manager may direct administrative and technical specifications for that plant to be met.
55 (1) A provincial safety manager may register a plant as a general supervision status plant operation if the plant
(a) is not located in an institution or public assembly occupancy premises,
(b) is
(i) a power plant that does not exceed 30 m2 of boiler capacity,
(ii) a low pressure steam plant that does not exceed 200 m2 of boiler capacity,
(iii) a low pressure fluid or low pressure thermal fluid plant that does not exceed 500 m2 of boiler capacity,
(iv) a low temperature low pressure fluid plant that does not exceed 2 000 m2 of boiler capacity,
(v) an unfired plant that does not exceed 1 000 m2 of boiler capacity, or
(vi) a refrigeration plant that does not exceed a total plant capacity of 1 000 kW prime mover nameplate rating,
(c) has every boiler in the plant equipped with a low water fuel cut-off device that
(i) has a manual reset that is in addition to, and independent of, any other low water fuel cut-off device required under the Act or this regulation, and
(ii) is tested weekly or as required by a provincial safety manager and for which the results are recorded by the person in charge of the plant, and
(d) meets all the administrative and technical specifications issued by a provincial safety manager after a successful review.
(2) A general supervision status plant operation requires the presence of a power engineer with the appropriate class of certificate of qualification as determined by a plant safety audit inspection and as required by a provincial safety manager.
(3) A plant operating as a general supervision status plant must, as a minimum, have a power engineer with the appropriate class of certificate of qualification who must inspect the plant in accordance with conditions established by a provincial safety manager.
56 (1) A provincial safety manager may register a plant as a risk assessed status plant if the plant
(a) is a low pressure fluid plant or low pressure thermal fluid plant not exceeding 500 m2 of boiler capacity,
(b) is a low temperature low pressure fluid plant that does not exceed 2 000 m2 of boiler capacity,
(c) is an unfired plant not exceeding 1 000 m2 of boiler capacity,
(d) is a refrigeration plant not exceeding a total plant capacity of 1 000 kW prime mover nameplate rating, or
(e) meets all the administrative and technical specifications issued by a provincial safety manager after a successful review.
(2) A plant operating under the risk assessed status plant category must, as a minimum, have a power engineer with the appropriate certificate of qualification who
(a) is on the premises of the plant not less than 7 hours per day or such greater time as may be required by a provincial safety manager, and
(b) inspects the plant in accordance with conditions established by a provincial safety manager as part of the registration under section 55.
Division 4 — Contractor's Licence
57 A person must hold a contractor's licence in order to perform regulated work under an installation permit.
58 A bond is not required to obtain or renew a contractor's licence.
59 Section 6 (a) of the Safety Standards General Regulation does not apply to an application for a boiler contractor's licence under this Division.
60 The following classes of contractor's licence are established:
(a) pressure retaining equipment:
(i) class "A", boiler, pressure vessel and pressure piping;
(ii) class "Au", pressure vessel and pressure piping;
(iii) class "Ap", pressure piping;
(iv) class "B", limited capacity boiler, pressure vessel and pressure piping;
(b) class "REF", refrigeration;
(c) class "SRV", safety valve and relief valve service;
(d) class "MA" manufacturing shop.
[am. B.C. Reg. 475/2004, Sch. 4, s. 9.]
61 (1) Every licensed contractor must, before the commencement of any work,
(a) give notice to a provincial safety manager respecting every construction, installation, repair or alteration of equipment to which the Act applies that the contractor performs, and
(b) provide evidence satisfactory to a provincial safety manager that the work to be performed falls within the scope of the contractor's licence.
(2) On the completion of work, a contractor must
(a) notify a safety manager whether the construction, installation, repair or alteration has been completed in accordance with this regulation, and
(b) submit to a safety officer
(i) data reports, as defined in CSA B51 or the National Board Inspection Code ANSI/NB-23, or both, for every installation, repair or alteration of equipment to which this regulation applies, and
(ii) a repair or alteration report in the case of a repair or alteration of equipment to which this regulation applies.
(3) On completion of work under a permit on a refrigeration plant using a Group Al, A2 or B1 refrigerant and having a capacity of 125 kW or more prime mover nameplate rating or using a Group A3, B2 or B3 refrigerant and having a capacity of 25 kW or more prime mover nameplate rating, the licensed contractor must, before testing is done, request an inspection from a provincial safety officer.
Part 2 — Requirements for Permits, Regulated Products and Inspections by Safety Officers
Division 1 — Permit Requirements
62 (1) A person must have an installation permit to install or alter any of the following:
(a) a boiler;
(b) a refrigeration system or part of a refrigeration system.
(2) A person must hold an operating permit for each boiler, pressure vessel or refrigeration system.
(3) If a person holds an operating permit under subsection (2), the permit holder or an employee of the permit holder may perform routine maintenance or minor repairs to that equipment without holding a boiler or refrigeration contractor's licence.
(4) A provincial safety manager may, in a particular case, determine what constitutes routine maintenance or minor repairs for the purpose of subsection (3).
(5) An owner may apply for an installation permit to perform an installation or repair of equipment to which this regulation applies that would otherwise require a licensed contractor to apply for the permit if
(a) the owner submits a written application to a provincial safety manager specifying the work to be done in the plant and the equipment and components to be used, and
(b) the owner provides the name and qualifications of the individual who will perform the work under the permit.
(6) A person who applies for a permit for a refrigeration plant using a Group Al, A2 or B1 refrigerant and having a capacity of 125 kW or more prime mover nameplate rating, or using a Group A3, B2 or B3 refrigerant and having a capacity of 25 kW or more prime mover nameplate rating, must submit piping design drawing with the permit application.
(7) An installation permit issued under this regulation is not required to name a field safety representative.
63 (1) An installation permit is not required to install any of the following:
(a) a pressure vessel;
(b) a refrigeration plant of up to 5 kW prime mover nameplate rating.
(2) In respect of refrigeration equipment, a refrigeration mechanic may, without an installation permit,
(a) replace valves, controls, piping, refrigerant or relief devices with components of a similar type that have been approved by a provincial safety manager or a similar regulatory authority in another province, and
(b) maintain or overhaul refrigeration system components.
Division 2 — Inspections by Safety Officers
64 To prepare equipment for inspection, the owner, chief engineer or a person designated by the chief engineer must do all of the following:
(a) if a hydrostatic test or other pressure test is considered necessary by a safety officer, prepare the boiler, pressure vessel, refrigeration system or pressure piping system for the required test;
(b) at the request of a safety officer, remove all jackets, coverings and casings from the equipment being inspected;
(c) perform non-destructive tests as required by a safety officer to carry out inspections;